2017 - 2019
This project is funded partially by the Australian Government through the Australian Research Council ARC NetZero HUB.
SBEnrc’s research Project 1.43 Retrofitting Public Buildings for Energy and Water Efficiency has been successful in leveraging into this ARC Linkage project
The disparity found between the predicted energy consumption in the design stage of buildings and the actual energy use during operation is known as the energy performance gap. According to recent studies, the actual energy consumption can be up to 2.5 times higher than the predicted. Inaccurate prediction of energy savings can cause significant financial loss to the clients and investors because in a retrofitting project the installation cost of the retrofit measures is repaid from energy savings. The performance gap may arise due to various reasons during the project’s lifecycle. These may include issues at the design stage such as faulty design assumptions or simplification in design, errors related to the construction and commissioning works, and problems occurring in the operation stage such as inefficient operational practices.
This project aims to develop a methodology that will help to minimise the performance gap that may arise from design, construction and operational stages in buildings. The objectives are:
The expected outcomes include a list of influencing factors, a relevant improvement strategy and frameworks that will help the designers and contractors to minimise the performance gap. This will also help facility managers to attain optimum operational efficiency. Other potential impacts include:
Chief Investigator
Professor Patrick X W Zou
BE (Civil), PhD
Project Leader, Swinburne University
Chair, Project Steering Group
Chris Buntine
Environmental Systems Design Leader, Aurecon
Project Manager
Morshed Alam
PhD
Project Manager, Swinburne University
Strategies for minimizing building energy performance gaps between the design intend and the reality, Patrick X.W. Zou, Dipika Wagle , Morshed Alam, Energy and Buildings, Volume 191, 15 May 2019, Pages 31-41 (May 2019, 2Mb)
Energy saving performance assessment and lessons learned from the operation of an active phase change materials system in a multi-storey building in Melbourne, Morshed Alam, Patrick X.W. Zou, Jay Sanjayan, Sayanthan Ramakrishnan, Applied Energy, Volume 238, 15 March 2019, Pages 1582-1595 (Mar 2019, 3Mb)