2015 - 2019
This project is funded partially by the Australian Government through the Australian Research Council.
SBEnrc’s research Project 3.27 Using Building Information Modelling (BIM) for Smarter and Safer Scaffolding Construction has been successful in leveraging into this ARC Linkage project.
This project will innovatively integrate a decision support system, virtual design and construction, and onsite monitoring into one dynamic planning system to significantly improve construction site productivity. The emphasis is on producing optimal solutions for planning, design, erection, monitoring, dismantling and relocation of scaffolding, so that productivity is maximised subject to satisfying required cost and safety constraints.
Chair, Project Steering Group
Professor Keith Hampson
BEng (Hons), MBA, PhD, HonFIEAust, FTSE, FAICD
Chair of SBEnrc Governing Board and former CEO SBEnrc (2001-2026)
Project Leader
Professor Xiangyu Wang
Project Leader
A Framework Design for Optimising Scaffolding Erection by Applying Mathematical Models and Virtual Simulation, American Society of Civil Engineers (2014)
Case Studies of BIM-based Dynamic Scaffolding Design and Safety Prevention (2014)
Discrete Firefly Algorithm for Scaffolding Construction Scheduling, American Society of Civil Engineers (2016)